The Sustainable Development Investment Fund carried out studies of Aske Group’s 110/10kV «Dzularan» Substation at Charentsavan Community of Kotayk Region of RA and developed proposals for mitigation of the impact on its electrical power system.
As a result, it was proposed:
-To replace T-1 110/10 kV 16 MVA power transformer by 40 MVA installed capacity transformer with a load redistribution
-To apply local (near powerful consumers) or group reactive power compensation by installing static thyristor compensators with the aim to ensure voltage qualitative indicators in internal network and to take measures to detect possible electromagnetic distortions